Metromotion Controls turns the data your lines already produce into improvement work: where yield, throughput, changeover and cleaning time are being lost, why, and whether a change on the line actually fixed it.
Most plants collect more data than they use. The historian fills up, the OEE screen shows a number, and the improvement meeting still runs on opinion. Useful analytics starts from a question the plant cares about, such as why one SKU loses more yield or why CIP on one circuit takes longer, and answers it from data that is known to be right. Metromotion Controls does this as the team that programs the lines, so the signals are checked against the logic, and fixes that need a change in the PLC or SCADA can be made by the same people.
Analytics projects stall when they start with a tool and a wish to see everything. They deliver when they start with one loss the plant already knows about and a decision someone will make with the answer. We agree that question first, then work back to the data needed to answer it.
An analysis is only as good as the signals behind it. A count from the wrong tag or a state that means two things will produce a confident, wrong answer. Before analysing, we trace each signal to the PLC logic that sets it and check it against what the line did. Where context is missing, such as the SKU, order or shift, we add it in the data layer so every record can be grouped the way the question needs.
The analysis itself is usually straightforward once the data is right. Most findings come from comparing like with like and looking at the distribution, not the average.
A finding is only useful when something changes. Sometimes that is a work practice or a schedule. Often it is in the control system: a sequence step that waits too long, a set-point that drifts, a CIP step that runs longer than validation requires, or a missing alarm. Because we program and support the control system, the fix can be made, commissioned and then measured with the same data that found the problem.
Most analysis needs a clean SQL data layer and a tool the site already knows, such as Power BI or Excel, rather than a new platform. Live views stay in SCADA, where operators work. Specialist analytics or machine-learning tools can be added later when a question needs them, and they work better on the same structured data. For reporting surfaces, see production reports and dashboards.
It is the use of production data from PLCs, SCADA, historians and quality systems to find where a plant loses output, yield or time, and to check whether changes fix it. In a mid-size food plant it is mostly careful comparison of trusted data, not complex models.
Usually not to start. Most losses are found with clean data, the right context and simple comparisons. Machine learning can help with specific problems later, and it needs the same trusted, structured data to work.
That depends on the plant and the losses. We do not quote improvement figures we have not measured on your line. The first piece of work is sized so its result can be measured.
Yes. Most plants already have useful data in a historian, SCADA or spreadsheets. We check it against the line, fill the gaps in context, and start from there.
OEE, reports, quality, CIP, maintenance and energy data from the team that builds and programs the lines.
Live OEE, line status and stop reasons read directly from the PLCs on food and beverage lines.
Shift, daily and weekly reports generated from line data and delivered to SCADA, Power BI or email.
The right tag for each count and one meaning for each state, validated against the line and placed in context.
Getting PLC and SCADA data into Power BI cleanly: the SQL layer, context and refresh limits.
How availability, performance and quality are actually calculated, and why source-of-truth machine data matters.
The unified namespace, MQTT and Sparkplug, OPC UA, historian contextualisation and ISA-95 alignment for a single source of plant truth.
Large capital project delivery across process automation, electrical engineering and commissioning.
OEE and downtime reporting from PLC states, with shift and weekly management reports for an Australian yoghurt plant.
OEE data platform and line integration for production performance reporting.
Ignition Gold Certified System Integrator for Ignition SCADA, historian, reporting and MES functions.
Automation, traceability, CIP, SCADA and production data for Australian food and beverage plants.
Machine automation, line integration, OEE data and controls upgrades for high-volume manufacturing sites.
Chobani needed a controls partner to help establish its Australian manufacturing operation with new production lines and site infrastructure, and the relationship has had to keep adding and optimising lines without disturbing production already running on site. Metromotion Controls supported the initial setup and has continued to add, optimise and support production lines over the years, bringing process, packaging and site services onto common control and data interfaces so each addition extends one operating environment rather than a separate island. The scope spans plant services including boilers, refrigeration, trade waste, power monitoring and water usage monitoring, plus OEE, site data analytics and contextualised production data from lab equipment and other external sources.
Building on the greenfield automation delivered at Chobani's Australian facility, Metromotion Controls was engaged to develop an OEE data platform that gave the operations team structured visibility of line performance, availability losses, and production output. The project connected existing PLC infrastructure to a centralised reporting environment, establishing consistent downtime reason codes, shift-level OEE calculation, and management dashboards aligned to how the site teams already ran daily reviews.
Cobs Fine Foods is one of Australia's leading premium snack manufacturers. The business needed real-time production data from all line equipment, including checkweigher and metal detector systems, connected to a centralised OEE platform provided by a third-party vendor. Metromotion Controls designed and delivered the automation integration layer, connecting each line asset to Ignition, capturing data at PLC level, and passing it upstream to the OFS OEE platform. The project included full network architecture design, device configuration, and the PLC logic required for clean, consistent data capture across the line.
Factory data, OEE, reports, quality, CIP, maintenance and energy from the team that builds and programs the lines.
Live OEE, line status and stop reasons read directly from the PLCs, shown to operators, supervisors and managers when each of them needs it.
Shift, daily and weekly production reports generated from line data and delivered to SCADA screens, Power BI or email, with no typed entries or spreadsheet collation.
Accurate, contextualised plant data built from the right tags and states, validated against the line during commissioning, so reports and dashboards can be trusted.