Skip to content
Rockwell and PLC control automation topic hub from Metromotion Controls
Platform hub

Rockwell and PLC control

Most Australian sites run Rockwell or mixed PLC platforms, and the work of programming, migrating and cutting over those systems has its own discipline. These guides cover PLC programming practice, reading a P&ID into control logic, batch structure and the planning and execution of an upgrade on a live plant.

The cluster links the PLC and control work Metromotion Controls delivers to the project case studies where legacy migration and commissioning were carried out without losing production.

Guides in this hub
Article thumbnail for Legacy PLC Migration in Australia: Planning an Upgrade Without Losing Production
PLC & Control Systems · 11 min
Legacy PLC Migration in Australia: Planning an Upgrade Without Losing Production
How to plan a legacy PLC migration on a live Australian plant: when to start, how to scope the outage window, and how to stage the cutover.
Apr 2026
Article thumbnail for SLC 500 and PLC-5 End of Life: Upgrading to CompactLogix and ControlLogix in Australia
PLC & Control Systems · 9 min
SLC 500 and PLC-5 End of Life: Upgrading to CompactLogix and ControlLogix in Australia
How to plan an SLC 500 or PLC-5 upgrade to CompactLogix or ControlLogix on a live Australian plant, with a real SLC 500 churn migration as the worked example.
Sept 2026
Article thumbnail for PLC Platform Comparison for Australian Manufacturers: How to Choose the Right Fit
PLC Programming · 6 min
PLC Platform Comparison for Australian Manufacturers: How to Choose the Right Fit
Choosing a PLC platform for an Australian plant comes down to a few practical considerations: native communications protocols, local spares, the right model in the range, local integrator support, and what your own team is comfortable using.
June 2026
Article thumbnail for PLC Programming Services in Melbourne: What to Expect and How to Choose
PLC & Control Systems · 9 min
PLC Programming Services in Melbourne: What to Expect and How to Choose
Buyer guide to PLC programming in Melbourne: process-first design, modular code, language choice, diagnostics, FAT discipline and operator support.
Apr 2026
Article thumbnail for From a P&ID to Control Logic: How an Experienced Team Programs a Process from the Drawing
Control Systems · 9 min
From a P&ID to Control Logic: How an Experienced Team Programs a Process from the Drawing
How a controls engineer reads ISA-5.1 P&ID symbology and derives equipment modules, sequences, interlocks and loops from the drawing plus one conversation.
June 2026
Article thumbnail for Batch Control and ISA-88 for Australian Food and Beverage Manufacturers
Control Systems · 9 min
Batch Control and ISA-88 for Australian Food and Beverage Manufacturers
A practical ISA-88 guide for Australian food and beverage plants: when batch control pays off, the three models, phase states, FSANZ traceability and migration.
May 2026

Have a project in mind? Talk to our engineers

Tell us what you're working on and we'll give you a clear view on scope, approach and what's involved.